Substation Scout

Tuscola, MI interconnection queue

15 active projects totaling 2,038.6 MW in the MISO queue, plus 10 with terminal status (shown grayed).

15active projects
2,038.6active MW
25total filed
Queue IDProjectkVMWResourceStatus
J4016 Not reported 138 300 Battery Active
H030 Not reported 120 200 Wind Withdrawn
J170 Not reported 138 200 Wind Withdrawn
J3852 Not reported n/r 200 Solar Active
J2578 Not reported 138 180 Solar Active
J3743 Not reported n/r 175.5 Wind Active
J4047 Not reported 138 160 Solar Active
J161 Not reported 345 155 Wind Operational
J3636 Not reported n/r 150 Battery Active
J2490 Not reported 120 125 Solar Active
J267 Not reported 138 125 Wind Withdrawn
J202 Not reported 115 101 Wind Operational
J301 Not reported 345 101 Wind Operational
S1059 Surplus; J199/J202 120 100.3 Hybrid Active
J245 Not reported n/r 100 Wind Withdrawn
J3470 Not reported n/r 100 Solar Active
J752 Not reported 345 100 Wind Operational
J969 Not reported 345 100 Solar Withdrawn
S1007 Surplus; J202 120 70 Hybrid Withdrawn
J2592 Not reported 138 50 Battery Withdrawn
J701 Not reported 345 49 Wind Operational
J3336 Not reported n/r 41.8 Wind Active
J1103 Not reported 345 20 Battery Withdrawn
J786 Not reported n/r 10 Battery Withdrawn
J1126 Not reported 345 1.1 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first