Queue request J202 was listed in the MISO interconnection queue at the end of 2025 as a 101 MW wind project in Tuscola County, MI, according to Berkeley Lab’s queue data file. The filing names ITC Atlanta - Tuscola as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 15, 2014.

Queue IDJ202
Project nameNot reported
Status (as published)Operational
SubstationITC Atlanta - Tuscola
Point of interconnectionITC Atlanta - Tuscola 115 kV
CountyTuscola
StateMI
Voltage115 kV
Capacity101 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2014-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tuscola, MI: 25 requests in the MISO queue, 15 active totaling 2,038.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG MI
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2011-02-16
Interconnection agreement date2013-05-01
Operational date2014-10-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.