Substation Scout

MISO request J161

MISO queue ID J161

Queue request J161 was listed in the MISO interconnection queue at the end of 2025 as a 155 MW wind project in Tuscola County, MI, according to Berkeley Lab’s queue data file. The filing names Bauer - Rapson as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2012.

Queue IDJ161
Project nameNot reported
Status (as published)Operational
SubstationBauer - Rapson
Point of interconnectionBauer - Rapson 345 kV
CountyTuscola
StateMI
Voltage345 kV
Capacity155 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2012-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bauer - Rapson substation: 4 requests in the MISO queue, 3 active totaling 415 MW.

Queue IDProjectMWResourceStatus
J075Not reported150WindOperational
J235Not reported110WindOperational
J185Not reported100WindWithdrawn

Tuscola, MI: 25 requests in the MISO queue, 15 active totaling 2,038.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG MI
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2010-08-31
Interconnection agreement date2013-06-21
Operational date2012-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first