J2171 Not reported n/r 500 Hybrid Active
J1712 Not reported 345 300 Solar Active
J2626 Not reported 345 300 Solar Withdrawn
J1306 Not reported 345 200 Solar Active
J3060 Not reported 345 200 Solar Withdrawn
J3135 Not reported n/r 200 Solar Withdrawn
S1095 Surplus; J1712 345 200 Battery Active
J3064 Not reported 345 157 Solar Active
J2306 Not reported n/r 150 Solar Withdrawn
J3306 Not reported n/r 150 Solar Active
J3063 Not reported 345 143 Battery Active
J1777 Not reported 138 100 Solar Active
S1103 Surplus 138 100 Battery Active
J1695 Not reported 138 50 Battery Withdrawn
J3189 Not reported 138 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first