MISO request J3064

MISO queue ID J3064

Queue request J3064 was listed in the MISO interconnection queue at the end of 2025 as a 157 MW solar project in Perry County, IL, according to Berkeley Lab’s queue data file. The filing names 7JORD - 7CMDR as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 20, 2026.

Queue IDJ3064
Project nameNot reported
Status (as published)Active
Substation7JORD - 7CMDR
Point of interconnection7JORD - 7CMDR 345.0kV
CountyPerry
StateIL
Voltage345 kV
Capacity157 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-10-20
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

7JORD - 7CMDR substation: 2 requests in the MISO queue, 2 active totaling 300 MW.

Queue IDProjectMWResourceStatus
J3063Not reported143BatteryActive

Perry, IL: 15 requests in the MISO queue, 9 active totaling 1,850 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.