Surplus (S1103) was listed in the MISO interconnection queue at the end of 2025 as a 100 MW battery project in Perry County, IL, according to Berkeley Lab’s queue data file. The filing names Aster Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2026.
| Queue ID | S1103 |
|---|---|
| Project name | Surplus |
| Status (as published) | Active |
| Substation | Aster Station |
| Point of interconnection | Aster 138kV Station |
| County | Perry |
| State | IL |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2026-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Perry, IL: 15 requests in the MISO queue, 9 active totaling 1,850 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Project type | Generation |
| Queue date | 2025-06-17 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.