MISO request J2171

MISO queue ID J2171

Queue request J2171 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW hybrid project in Perry County, IL, according to Berkeley Lab’s queue data file. The filing names Aster to Commodore as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2024.

Queue IDJ2171
Project nameNot reported
Status (as published)Active
SubstationAster to Commodore
Point of interconnectionAster to Commodore
CountyPerry
StateIL
VoltageNot reported
Capacity500 MW
Resource (as published)Solar+Wind
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Perry, IL: 15 requests in the MISO queue, 9 active totaling 1,850 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2021 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-03-25
Components (hybrid)Solar 500 MW + Wind

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.