Substation Scout

Surplus; J1712

MISO queue ID S1095

Surplus; J1712 (S1095) was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Perry County, IL, according to Berkeley Lab’s queue data file. The filing names 7ASTER - 7CMDR as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 28, 2027.

Queue IDS1095
Project nameSurplus; J1712
Status (as published)Active
Substation7ASTER - 7CMDR
Point of interconnection7ASTER - 7CMDR 345.0kV
CountyPerry
StateIL
Voltage345 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-05-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

7ASTER - 7CMDR substation: 2 requests in the MISO queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
J2697Not reported500HybridWithdrawn

Perry, IL: 15 requests in the MISO queue, 9 active totaling 1,850 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
Project typeGeneration
Queue date2025-04-22

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first