MISO request J1712
MISO queue ID J1712
Queue request J1712 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW solar project in Perry County, IL, according to Berkeley Lab’s queue data file. The filing names North Coulterville - COMM as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2025.
| Queue ID | J1712 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | North Coulterville - COMM |
| Point of interconnection | North Coulterville - COMM 345kV |
| County | Perry |
| State | IL |
| Voltage | 345 kV |
| Capacity | 300 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2025-12-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Perry, IL: 15 requests in the MISO queue, 9 active totaling 1,850 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2020 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2020-06-23 |
| Interconnection agreement date | 2025-06-17 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.