MISO request J1777

MISO queue ID J1777

Queue request J1777 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Perry County, IL, according to Berkeley Lab’s queue data file. The filing names Aster Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDJ1777
Project nameNot reported
Status (as published)Active
SubstationAster Substation
Point of interconnectionAster 138kV Substation
CountyPerry
StateIL
Voltage138 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Aster Substation substation: 2 requests in the MISO queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
S1029Surplus; J80899HybridWithdrawn

Perry, IL: 15 requests in the MISO queue, 9 active totaling 1,850 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2020 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2020-06-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.