Substation Scout

Temple Pecan Creek substation interconnection queue

2 active projects totalling 254.6 MW in the ERCOT queue.

2active projects
254.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0249 Limewood Solar 138 204.6 Solar SS Completed, FIS Completed, IA
23INR0248 Limewood Storage 138 50 Battery SS Completed, FIS Started, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.