Temple Pecan Creek
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Bell County. First named in the release with data as of February 1, 2023.
A HIFLD substation record has the same name and county: TEMPLE PECAN CREEK (BELL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Bell, TX: ERCOT queue, 14 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line Rebuild the Temple - Temple Pecan Creek 345 kV Lines ERCOT project 110018A · utility no. R6532 · RPG 25RPG009 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Temple to Temple Pecan Creek Bell County |
Temple, Temple Pecan Creek |
| Temple - Temple Pecan 138 kV 2nd Circuit ERCOT project 76572 · utility no. R6235 |
ONCOR Tier 1 |
Planned Current-year planned tab |
138 | Dec 2026 | Temple to Temple Pecan Creek Bell County |
Temple, Temple Pecan Creek |
| Upgrade the Temple Pecan - Temple Elm 138 kV Double-Circuit Line Upgrade the 5-mile Temple Pecan - Temple Elm 138 kV Double-Circuit Line ERCOT project 76578 · utility no. R6234 · RPG 24RPG001 · RTP 2023-NC61 |
ONCOR Tier 1 |
In-Service Completed tab |
138 | May 2025 actual 2025-06 |
Temple Pecan Creek to Temple Elm Creek Bell County |
Temple Pecan Creek, Temple Elm Creek |
| Rebuild the Temple Pecan Creek Switch - Belfalls/STR 26/4C 345 kV Double Circuit Line ERCOT project 99346 · utility no. R6434 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2028 | Temple Pecan Creek to Belfalls Bell County |
Temple Pecan Creek, Belfalls |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110018A | First listed | on the Future tab |
| June 1, 2026 | 99346 | Projected in-service date | May 2030 → May 2028 |
| February 1, 2026 | 76572 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 76572 | Projected in-service date | Jun 2026 → Dec 2026 |
| February 1, 2026 | 76578 | Status as reported | Planned → In-Service |
| February 1, 2026 | 99346 | Projected in-service date | May 2028 → May 2030 |
| October 1, 2025 | 99346 | First listed | on the Future tab |
| June 1, 2025 | 76578 | Moved between tabs | Future → Completed |
| October 1, 2024 | 76572 | Projected in-service date | Dec 2025 → Jun 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.