2 active projects totaling 1,776.6 MW in the ERCOT queue.

2 ERCOT queue filings name Tap # Temple Switch - # Tower Switch DCKT Line as the point of interconnection, all in Bell County, TX.

2active projects
1,776.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0508 TempleCloud Gas 345 1,139.7 Gas SS Completed, FIS Started, No IA
29INR0206 Riviera Gas 345 636.9 Gas SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.