Substation Scout

Tapping the Elm Creek to Shaula circuit 1 substation interconnection queue

2 active projects totaling 226.3 MW in the ERCOT queue.

2 ERCOT queue filings name Tapping the Elm Creek to Shaula circuit 1 as the point of interconnection, all in Wilson County, TX.

Target commercial operation date as filed: Jun 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Huisache Solar, LLC (2 filings).

2active projects
226.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
24INR0160 Huisache Solar n/r 125.6 Solar SS Completed, FIS Completed, IA Jun 2029
24INR0376 Huisache BESS n/r 100.7 Battery SS Completed, FIS Completed, IA Jun 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-0924INR0160Status changen/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA
2026-11-0924INR0376Status changen/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Other ERCOT queue substations in Wilson County, TX

All 18 ERCOT queue filings in Wilson County, TX.