Tapping the Elm Creek to Shaula circuit 1 substation interconnection queue
2 active projects totaling 226.3 MW in the ERCOT queue.
2 ERCOT queue filings name Tapping the Elm Creek to Shaula circuit 1 as the point of interconnection, all in Wilson County, TX.
Target commercial operation date as filed: Jun 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Huisache Solar, LLC (2 filings).
2active projects
226.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 24INR0160 | Huisache Solar | n/r | 125.6 | Solar | SS Completed, FIS Completed, IA | Jun 2029 |
| 24INR0376 | Huisache BESS | n/r | 100.7 | Battery | SS Completed, FIS Completed, IA | Jun 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | 24INR0160 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
| 2026-11-09 | 24INR0376 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Other ERCOT queue substations in Wilson County, TX
- Tap the Elm Creek (#) - Shaula (#) Line, CPS: 3 active, 628.2 MW of 3 filed
- Tap Eagle Creek to Floresville: 2 active, 375.8 MW of 2 filed
Site Scanner