Substation Scout

Tap the Elm Creek (#) - Shaula (#) Line, CPS substation interconnection queue

3 active projects totaling 628.2 MW in the ERCOT queue.

3 ERCOT queue filings name Tap the Elm Creek (#) - Shaula (#) Line, CPS as the point of interconnection, all in Wilson County, TX.

Target commercial operation date as filed: Jun 2029 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Pecan Springs Energy, LLC (3 filings).

3active projects
628.2active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0319 Nockenut Springs Storage 2 345 209.4 Battery SS Completed, FIS Started, No IA Jun 2029
29INR0320 Nockenut Springs Storage 3 345 209.4 Battery SS Completed, FIS Started, No IA Jun 2029
29INR0318 Nockenut Springs Storage 1 345 209.4 Battery SS Completed, FIS Started, No IA Jun 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Wilson County, TX

All 18 ERCOT queue filings in Wilson County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first