Tap the Elm Creek (#) - Shaula (#) Line, CPS substation interconnection queue

3 active projects totalling 628.2 MW in the ERCOT queue.

3active projects
628.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
29INR0319 Nockenut Springs Storage 2 345 209.4 Battery SS Completed, FIS Started, No IA
29INR0320 Nockenut Springs Storage 3 345 209.4 Battery SS Completed, FIS Started, No IA
29INR0318 Nockenut Springs Storage 1 345 209.4 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.