Tap Eagle Creek to Floresville substation interconnection queue
2 active projects totaling 375.8 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Eagle Creek to Floresville as the point of interconnection, all in Wilson County, TX.
Target commercial operation date as filed: Mar 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Moon Stone Battery Facility LLC (1 filing), Moon Stone Solar Farm, LLC (1 filing).
2active projects
375.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0299 | Moon Stone BESS | 138 | 200.8 | Battery | SS Completed, FIS Started, No IA | Mar 2029 |
| 24INR0156 | Moonstone Solar Project | 138 | 175 | Solar | SS Completed, FIS Completed, IA | Mar 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Wilson County, TX
- Tap the Elm Creek (#) - Shaula (#) Line, CPS: 3 active, 628.2 MW of 3 filed
- Tapping the Elm Creek to Shaula circuit 1: 2 active, 226.3 MW of 2 filed