Big River Solar
ERCOT queue ID 23INR0215
| Queue ID | 23INR0215 |
|---|---|
| Project name | Big River Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap Zapata - Lopeno4A |
| Point of interconnection | tap 138kV 8299 Zapata - 8957 Lopeno4A |
| County | Zapata |
| State | TX |
| Voltage | 138 kV |
| Capacity | 104.4 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Rio Grande River Solar LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 44404 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.