Substation Scout

Big River Solar

ERCOT queue ID 23INR0215

Big River Solar (23INR0215) is listed in the ERCOT interconnection queue as a 104.4 MW solar project in Zapata County, TX. The filing names tap Zapata - Lopeno4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on July 27, 2021.

Queue ID23INR0215
Project nameBig River Solar
Status (as published)SS Completed, FIS Started, No IA
Substationtap Zapata - Lopeno4A
Point of interconnectiontap 138kV 8299 Zapata - 8957 Lopeno4A
CountyZapata
StateTX
Voltage138 kV
Capacity104.4 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

tap Zapata - Lopeno4A substation: 2 requests in the ERCOT queue, 2 active totaling 155.7 MW.

Queue IDProjectMWResourceStatus
23INR0237Big River BESS51.3BatterySS Completed, FIS Started, No IA

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRio Grande River Solar LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2021-07-27
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.