Tap Voss Lake switch # – Badger Switch # substation interconnection queue
2 active projects totalling 303.7 MW in the ERCOT queue.
2active projects
303.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 29INR0059 | Brahman Renewables Storage | 345 | 203.1 | Battery | SS Completed, FIS Started, No IA |
| 29INR0058 | Brahman Renewables Solar | 345 | 100.6 | Solar | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.