Tap Voss Lake switch # – Badger Switch # substation interconnection queue

2 active projects totaling 307.5 MW in the ERCOT queue.

2 ERCOT queue filings name Tap Voss Lake switch # – Badger Switch # as the point of interconnection, all in Milam County, TX.

Target commercial operation date as filed: May 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Brahman Renewables (2 filings).

2active projects
307.5active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0059 Brahman Renewables Storage 345 206.9 Battery SS Completed, FIS Started, No IA May 2029
29INR0058 Brahman Renewables Solar 345 100.6 Solar SS Completed, FIS Started, No IA May 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0529INR0059Capacity revised+3.8 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Other ERCOT queue substations in Milam County, TX

All 35 ERCOT queue filings in Milam County, TX.