Substation Scout

Brahman Renewables Storage

ERCOT queue ID 29INR0059

Brahman Renewables Storage (29INR0059) is listed in the ERCOT interconnection queue as a 206.9 MW battery project in Milam County, TX. The filing names Tap Voss Lake switch # – Badger Switch # as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 1, 2029. It records the screening study as complete on January 25, 2025.

Queue ID29INR0059
Project nameBrahman Renewables Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Voss Lake switch # – Badger Switch #
Point of interconnectionTap Voss Lake switch #3751 – Badger Switch #3761 345 kV
CountyMilam
StateTX
Voltage345 kV
Capacity206.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-05-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Voss Lake switch # – Badger Switch # substation: 2 requests in the ERCOT queue, 2 active totaling 307.5 MW.

Queue IDProjectMWResourceStatus
29INR0058Brahman Renewables Solar100.6SolarSS Completed, FIS Started, No IA

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Capacity revised +3.8 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityBrahman Renewables
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-01-25

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first