Brahman Renewables Solar
ERCOT queue ID 29INR0058
Brahman Renewables Solar (29INR0058) is listed in the ERCOT interconnection queue as a 100.6 MW solar project in Milam County, TX. The filing names Tap Voss Lake switch # – Badger Switch # as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 1, 2029. It records the screening study as complete on January 25, 2025.
| Queue ID | 29INR0058 |
|---|---|
| Project name | Brahman Renewables Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Voss Lake switch # – Badger Switch # |
| Point of interconnection | Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV |
| County | Milam |
| State | TX |
| Voltage | 345 kV |
| Capacity | 100.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-05-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Voss Lake switch # – Badger Switch # substation: 2 requests in the ERCOT queue, 2 active totaling 307.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0059 | Brahman Renewables Storage | 206.9 | Battery | SS Completed, FIS Started, No IA |
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Brahman Renewables |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-01-25 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.