Line () GRISTMILL_5 to () TNTNP_ONE_3 substation interconnection queue

0 active projects totalling 0 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0163 Brazos Bend Solar SLF 345 243 Solar Cancelled
29INR0164 Brazos Bend Storage SLF 345 243 Battery Cancelled

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.