Substation Scout

Amerada Solar

ERCOT queue ID 26INR0082

Amerada Solar (26INR0082) is listed in the ERCOT interconnection queue as a 301.6 MW solar project in Freestone County, TX. The filing names Tap RICHLND2_5 - BIGBRNW_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 30, 2028. It records the screening study as complete on August 11, 2023.

Queue ID26INR0082
Project nameAmerada Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap RICHLND2_5 - BIGBRNW_5
Point of interconnectionTap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5
CountyFreestone
StateTX
Voltage345 kV
Capacity301.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap RICHLND2_5 - BIGBRNW_5 substation: 2 requests in the ERCOT queue, 2 active totaling 452.4 MW.

Queue IDProjectMWResourceStatus
26INR0084Amerada Storage150.8BatterySS Completed, FIS Started, No IA

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAmerada Solar, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2023-08-11
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first