Tap Morgan Creek to Gasconades Creek substation interconnection queue
2 active projects totaling 1,433.6 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Morgan Creek to Gasconades Creek as the point of interconnection, all in Mitchell County, TX.
Target commercial operation date as filed: Mar 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Spade Wind, LLC (1 filing), Spade BESS (1 filing).
2active projects
1,433.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0386 | Zeus Spade Wind | 345 | 987.3 | Wind | SS Completed, FIS Started, No IA | Mar 2028 |
| 26INR0387 | Zeus Spade BESS | 345 | 446.3 | Battery | SS Completed, FIS Started, No IA | Mar 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Mitchell County, TX
- Tap Ranger Camp - Prong Moss CKT #01 and #02: 3 active, 2,890.5 MW of 3 filed
- Cattleman (#) – Gasconades (#): 2 active, 759.9 MW of 2 filed
- Tap Cattlemen 5 - Gasconades Creek: 2 active, 709.2 MW of 2 filed