Cattleman (#) – Gasconades (#) substation interconnection queue

2 active projects totalling 759.9 MW in the ERCOT queue.

2active projects
759.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0212 Rosenix Solar n/r 501.6 Solar SS Started, FIS Started, No IA
29INR0213 Rosenix Storage n/r 258.3 Battery SS Started, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.