tap Deer Creek - Nixon substation interconnection queue
2 active projects totaling 128.5 MW in the ERCOT queue.
2 ERCOT queue filings name tap Deer Creek - Nixon as the point of interconnection, all in Gonzales County, TX.
Target commercial operation date as filed: Jul 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Hoke Solar Project, LLC (2 filings).
2active projects
128.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 23INR0231 | Hoke Solar | 138 | 95.3 | Solar | SS Completed, FIS Completed, IA | Jul 2027 |
| 23INR0232 | Hoke Storage | 138 | 33.2 | Battery | SS Completed, FIS Completed, IA | Jul 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Gonzales County, TX
- tap Elm Creek - STP ckt 1: 3 active, 607.9 MW of 3 filed