Tap (Bus #) FURHMANSB8 - (Bus #) VANDERBLTSW8 substation interconnection queue
2 active projects totaling 390.7 MW in the ERCOT queue.
2 ERCOT queue filings name Tap (Bus #) FURHMANSB8 - (Bus #) VANDERBLTSW8 as the point of interconnection, all in Victoria County, TX.
Target commercial operation date as filed: Mar 2030 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Oak Belt Storage, LLC (1 filing), Oak Belt Solar, LLC (1 filing).
2active projects
390.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 29INR0244 | Oak Belt Storage | 138 | 209.7 | Battery | SS Completed, FIS Started, No IA | Mar 2030 |
| 29INR0243 | Oak Belt Solar | 138 | 181 | Solar | SS Completed, FIS Started, No IA | Mar 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Victoria County, TX
- Tap DULCE7A - STATIC7A: 4 active, 2,905 MW of 4 filed
- To the line from EDNA (#) to VICTORIA4A (#): 2 active, 332 MW of 2 filed