2 active projects totaling 390.7 MW in the ERCOT queue.

2 ERCOT queue filings name Tap (Bus #) FURHMANSB8 - (Bus #) VANDERBLTSW8 as the point of interconnection, all in Victoria County, TX.

Target commercial operation date as filed: Mar 2030 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Oak Belt Storage, LLC (1 filing), Oak Belt Solar, LLC (1 filing).

2active projects
390.7active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0244 Oak Belt Storage 138 209.7 Battery SS Completed, FIS Started, No IA Mar 2030
29INR0243 Oak Belt Solar 138 181 Solar SS Completed, FIS Started, No IA Mar 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Victoria County, TX

All 22 ERCOT queue filings in Victoria County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first