2 active projects totaling 332 MW in the ERCOT queue.

2 ERCOT queue filings name To the line from EDNA (#) to VICTORIA4A (#) as the point of interconnection, all in Victoria County, TX.

Target commercial operation dates as filed run from Aug 2027 to Aug 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: GRS BESS Texas Eight (1 filing), GRS BESS Texas Eight LLC (1 filing).

2active projects
332active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0169 Marcos Solar SLF 138 216.1 Solar SS Completed, FIS Started, No IA Aug 2028
27INR0170 Marcos BESS 138 115.9 Battery SS Completed, FIS Started, No IA Aug 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Victoria County, TX

All 22 ERCOT queue filings in Victoria County, TX.