To the line from EDNA (#) to VICTORIA4A (#) substation interconnection queue
2 active projects totaling 332 MW in the ERCOT queue.
2 ERCOT queue filings name To the line from EDNA (#) to VICTORIA4A (#) as the point of interconnection, all in Victoria County, TX.
Target commercial operation dates as filed run from Aug 2027 to Aug 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: GRS BESS Texas Eight (1 filing), GRS BESS Texas Eight LLC (1 filing).
2active projects
332active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0169 | Marcos Solar SLF | 138 | 216.1 | Solar | SS Completed, FIS Started, No IA | Aug 2028 |
| 27INR0170 | Marcos BESS | 138 | 115.9 | Battery | SS Completed, FIS Started, No IA | Aug 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Victoria County, TX
- Tap DULCE7A - STATIC7A: 4 active, 2,905 MW of 4 filed
- Tap (Bus #) FURHMANSB8 - (Bus #) VANDERBLTSW8: 2 active, 390.7 MW of 2 filed