To the line from EDNA (#) to VICTORIA4A (#) substation interconnection queue

2 active projects totalling 332 MW in the ERCOT queue.

2active projects
332active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0169 Marcos Solar SLF 138 216.1 Solar SS Completed, FIS Started, No IA
27INR0170 Marcos BESS 138 115.9 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.