2 active projects totalling 332 MW in the ERCOT queue.

2active projects
332active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0169 Marcos Solar SLF 138 216.1 Solar SS Completed, FIS Started, No IA
27INR0170 Marcos BESS 138 115.9 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.