Barrosos Creek Wind 4

ERCOT queue ID 28INR0338

Barrosos Creek Wind 4 (28INR0338) is listed in the ERCOT interconnection queue as a 197.8 MW wind project in Zapata County, TX. The filing names # Rapido as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2028. It records the screening study as complete on October 13, 2025.

Queue ID28INR0338
Project nameBarrosos Creek Wind 4
Status (as published)SS Completed, FIS Started, No IA
Substation# Rapido
Point of interconnection#80227 Rapido 345 kV
CountyZapata
StateTX
Voltage345 kV
Capacity197.8 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2028-05-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

# Rapido substation: 2 requests in the ERCOT queue, 2 active totaling 395.6 MW.

Queue IDProjectMWResourceStatus
28INR0337Barrosos Creek Wind 3197.8WindSS Completed, FIS Started, No IA

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCascabel Wind Energy, LLC
CDR reporting zoneSOUTH
Fuel codeWIN
Technology codeWT
Screening study complete2025-10-13
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first