Barrosos Creek Wind 4 (28INR0338) is listed in the ERCOT interconnection queue as a 197.8 MW wind project in Zapata County, TX. The filing names # Rapido as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2028. It records the screening study as complete on October 13, 2025.
| Queue ID | 28INR0338 |
|---|---|
| Project name | Barrosos Creek Wind 4 |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | # Rapido |
| Point of interconnection | #80227 Rapido 345 kV |
| County | Zapata |
| State | TX |
| Voltage | 345 kV |
| Capacity | 197.8 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-05-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
# Rapido substation: 2 requests in the ERCOT queue, 2 active totaling 395.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 28INR0337 | Barrosos Creek Wind 3 | 197.8 | Wind | SS Completed, FIS Started, No IA |
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Cascabel Wind Energy, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | WIN |
| Technology code | WT |
| Screening study complete | 2025-10-13 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.