Nebula7A substation interconnection queue

2 active projects totalling 677.1 MW in the ERCOT queue.

2active projects
677.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0192 Cedar Draw Solar 345 451.4 Solar SS Completed, FIS Completed, No IA
27INR0193 Cedar Draw BESS 345 225.7 Battery SS Completed, FIS Completed, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.