Substation Scout

MHOS Substation (#) substation interconnection queue

2 active projects totaling 1,546.6 MW in the ERCOT queue.

2 ERCOT queue filings name MHOS Substation (#) as the point of interconnection, all in Scurry County, TX.

Target commercial operation date as filed: Oct 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Zeus Scurry BESS (1 filing), Scurry Solar, LLC (1 filing).

2active projects
1,546.6active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0535 Zeus Scurry BESS 345 1,043.1 Battery SS Completed, FIS Started, No IA Oct 2028
27INR0529 Zeus Scurry Solar 345 503.5 Solar SS Completed, FIS Started, No IA Oct 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “MHOS Substation (#)” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Scurry County, TX

All 23 ERCOT queue filings in Scurry County, TX.