MHOS Substation (#) substation interconnection queue
2 active projects totaling 1,546.6 MW in the ERCOT queue.
2 ERCOT queue filings name MHOS Substation (#) as the point of interconnection, all in Scurry County, TX.
Target commercial operation date as filed: Oct 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Zeus Scurry BESS (1 filing), Scurry Solar, LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0535 | Zeus Scurry BESS | 345 | 1,043.1 | Battery | SS Completed, FIS Started, No IA | Oct 2028 |
| 27INR0529 | Zeus Scurry Solar | 345 | 503.5 | Solar | SS Completed, FIS Started, No IA | Oct 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “MHOS Substation (#)” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Mhos: Expansion Tracker, ERCOT planning (Scurry County, TX)
Other ERCOT queue substations in Scurry County, TX
- Nebula7A: 2 active, 677.1 MW of 2 filed
- Tap TONKAWAW_5 – SCURCNTYS_5 Circuit #2: 2 active, 568.2 MW of 2 filed
- DERMOTT: 2 active, 204.5 MW of 2 filed
- GALVANI 345: 2 active, 200 MW of 2 filed