Substation Scout

Cedar Draw BESS

ERCOT queue ID 27INR0193

Cedar Draw BESS (27INR0193) is listed in the ERCOT interconnection queue as a 225.7 MW battery project in Scurry County, TX. The filing names Nebula7A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on June 19, 2024 and the full interconnection study as approved on September 23, 2026.

Queue ID27INR0193
Project nameCedar Draw BESS
Status (as published)SS Completed, FIS Completed, No IA
SubstationNebula7A
Point of interconnection60011 Nebula7A 345kV
CountyScurry
StateTX
Voltage345 kV
Capacity225.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Nebula7A substation: 2 requests in the ERCOT queue, 2 active totaling 677.1 MW.

Queue IDProjectMWResourceStatus
27INR0192Cedar Draw Solar451.4SolarSS Completed, FIS Completed, No IA

Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Completed, No IA

Full change log →

Additional filed fields

Interconnecting entityCedar Draw Solar LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2024-06-19
Full interconnection study approved2026-09-23

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.