GALVANI 345 substation interconnection queue

2 active projects totaling 200 MW in the ERCOT queue.

2 ERCOT queue filings name GALVANI 345 as the point of interconnection, all in Scurry County, TX.

Target commercial operation dates as filed run from Sep 2027 to Oct 2027 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Helion Solar LLC (1 filing), Helion BESS (1 filing).

2active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0623 Helion Solar n/r 100 Solar SS Completed, FIS Started, No IA Oct 2027
27INR0624 Helion BESS n/r 100 Battery SS Completed, FIS Started, No IA Sep 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-0727INR0623Status changen/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA
2026-09-0727INR0624Status changen/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA

Other ERCOT queue substations in Scurry County, TX

All 23 ERCOT queue filings in Scurry County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first