GALVANI 345 substation interconnection queue
2 active projects totaling 200 MW in the ERCOT queue.
2 ERCOT queue filings name GALVANI 345 as the point of interconnection, all in Scurry County, TX.
Target commercial operation dates as filed run from Sep 2027 to Oct 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Helion Solar LLC (1 filing), Helion BESS (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0623 | Helion Solar | n/r | 100 | Solar | SS Completed, FIS Started, No IA | Oct 2027 |
| 27INR0624 | Helion BESS | n/r | 100 | Battery | SS Completed, FIS Started, No IA | Sep 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-07 | 27INR0623 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-09-07 | 27INR0624 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Other ERCOT queue substations in Scurry County, TX
- MHOS Substation (#): 2 active, 1,546.6 MW of 2 filed
- Nebula7A: 2 active, 677.1 MW of 2 filed
- Tap TONKAWAW_5 – SCURCNTYS_5 Circuit #2: 2 active, 568.2 MW of 2 filed
- DERMOTT: 2 active, 204.5 MW of 2 filed