Substation Scout

Zeus Scurry Solar

ERCOT queue ID 27INR0529

Zeus Scurry Solar (27INR0529) is listed in the ERCOT interconnection queue as a 503.5 MW solar project in Scurry County, TX. The filing names MHOS Substation (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 1, 2028. It records the screening study as complete on August 29, 2025.

Queue ID27INR0529
Project nameZeus Scurry Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationMHOS Substation (#)
Point of interconnectionMHOS 345 kV Substation (#59911)
CountyScurry
StateTX
Voltage345 kV
Capacity503.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-10-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

MHOS Substation (#) substation: 2 requests in the ERCOT queue, 2 active totaling 1,546.6 MW.

Queue IDProjectMWResourceStatus
27INR0535Zeus Scurry BESS1,043.1BatterySS Completed, FIS Started, No IA

Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityScurry Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-08-29
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first