Bar Candela Solar SLF
ERCOT queue ID 24INR0269
Bar Candela Solar SLF (24INR0269) is listed in the ERCOT interconnection queue as a 200.3 MW solar project in Freestone County, TX. The filing names Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of May 16, 2029. It records the screening study as complete on June 13, 2022 and the interconnection agreement as signed on May 6, 2025.
| Queue ID | 24INR0269 |
|---|---|
| Project name | Bar Candela Solar SLF |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) |
| Point of interconnection | Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279) |
| County | Freestone |
| State | TX |
| Voltage | Not reported |
| Capacity | 200.3 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-05-16 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) substation: 2 requests in the ERCOT queue, 2 active totaling 200.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 24INR0271 | Bar Candela Storage SLF | 0 | Battery | SS Completed, FIS Started, IA |
Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Completed, FIS Completed, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Bar Candela Solar Project LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-05-06 |
| Screening study complete | 2022-06-13 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.