Substation Scout

Fowlerton substation interconnection queue

2 active projects totalling 400.1 MW in the ERCOT queue.

2active projects
400.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
22INR0357 Loma Pinta Solar 138 203.1 Solar SS Completed, FIS Started, No IA
16INR0112 Loma Pinta Wind 138 197 Wind SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.