Tap Los Angeles substation interconnection queue

2 active projects totalling 303.8 MW in the ERCOT queue.

2active projects
303.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0240 Dahlia Solar 138 201 Solar SS Completed, FIS Started, No IA
28INR0241 Dahlia BESS 138 102.8 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.