Encinal - Lemay Box Bay line substation interconnection queue

2 active projects totalling 211.4 MW in the ERCOT queue.

2active projects
211.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0101 Vazlon Solar SLF 138 211.4 Solar SS Completed, FIS Started, No IA
28INR0104 Vazlon BESS SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.