Substation Scout

Fowlerton

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in McMullen County. First named in the release with data as of February 1, 2015.

McMullencounty as printed
138, 345kV
STECutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in McMullen, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Upgrade Fowlerton to Los Angeles
(5705) FOWLERTON to (5723) LOS ANGELES 138 kV Ckt 1 Rebuild [245 MVA Minimum] or double circuit existing
ERCOT project 110228
STEC
Tier 4
Conceptual
Future tab
138 Jan 2031 Fowlerton to Los Angeles
McMullen / La Salle County
Fowlerton, Los Angeles
STEC Amphion Load Project Phase 1
-Hairpin San Miguel to Fowlerton ckt 2 into STEC Amphion load serving station -Loop in and out San Miguel to Cruce into STEC Amphion load station
ERCOT project 110455
STEC
Tier 2
Conceptual
Future tab
345 Jan 2030 San Miguel to Fowlerton, Cruce
Atascosa / McMullen County
San Miguel, Fowlerton, Cruce

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110228First listedon the Future tab
July 13, 2026110455First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first