Buck Canyon substation interconnection queue

2 active projects totalling 387.1 MW in the ERCOT queue.

2active projects
387.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0132 Caesar Storage 345 205.5 Battery SS Completed, FIS Started, No IA
29INR0131 Caesar Solar 345 181.6 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.