Caesar Solar
ERCOT queue ID 29INR0131
Caesar Solar (29INR0131) is listed in the ERCOT interconnection queue as a 181.6 MW solar project in Borden County, TX. The filing names Buck Canyon as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of November 26, 2029. It records the screening study as complete on October 22, 2025 and the interconnection agreement as signed on September 15, 2026.
| Queue ID | 29INR0131 |
|---|---|
| Project name | Caesar Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Buck Canyon |
| Point of interconnection | 59916 Buck Canyon 345 kV |
| County | Borden |
| State | TX |
| Voltage | 345 kV |
| Capacity | 181.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-11-26 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Buck Canyon substation: 2 requests in the ERCOT queue, 2 active totaling 387.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0132 | Caesar Storage | 205.5 | Battery | SS Completed, FIS Started, IA |
Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Caesar Solar, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2026-09-15 |
| Screening study complete | 2025-10-22 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.