MULESHOE (#) substation interconnection queue
2 active projects totaling 1,100 MW in the ERCOT queue.
2 ERCOT queue filings name MULESHOE (#) as the point of interconnection, all in Borden County, TX.
Target commercial operation dates as filed run from Nov 2026 to Oct 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Interconnecting entity as filed: Juno Solar 4 (1 filing), JUNO BESS I (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0434 | Lyra Solar | 345 | 600 | Solar | SS Completed, FIS Started, IA | Oct 2028 |
| 26INR0636 | Lyra Storage | 345 | 500 | Battery | SS Completed, FIS Started, IA | Nov 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | 27INR0434 | Capacity revised | +100 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Other ERCOT queue substations in Borden County, TX
- # Buck Canyon: 2 active, 1,200 MW of 2 filed
- Buck Canyon: 2 active, 387.1 MW of 2 filed
- FARADAY: 2 active, 180.8 MW of 2 filed