ERCOT queue ID 29INR0148

Big Field Solar (29INR0148) is listed in the ERCOT interconnection queue as a 506.2 MW solar project in Foard County, TX. The filing names Tap RILEY7A - EDITHCLA7B as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on September 4, 2025.

Queue ID29INR0148
Project nameBig Field Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap RILEY7A - EDITHCLA7B
Point of interconnectionTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
CountyFoard
StateTX
Voltage345 kV
Capacity506.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap RILEY7A - EDITHCLA7B substation: 6 requests in the ERCOT queue, 6 active totaling 3,256.5 MW.

Queue IDProjectMWResourceStatus
32INR0006H&C WILBARGER POWER I1,025.6GasSS Started, FIS Started, No IA
32INR0008H&C WILBARGER POWER II1,025.6GasSS Started, FIS Started, No IA
28INR0476Pease River Solar276.4SolarSS Completed, FIS Started, No IA
28INR0464Grayback Solar221.8SolarSS Completed, FIS Started, No IA
28INR0535Daisy Solar200.9SolarSS Completed, FIS Started, No IA

Foard, TX: 5 requests in the ERCOT queue, 5 active totaling 1,593.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBig Field Solar Energy LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-09-04
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first