Substation Scout

Foard, TX interconnection queue

5 active projects totalling 1,593.9 MW in the ERCOT queue.

5active projects
1,593.9active MW
5total filed
Queue IDProjectkVMWResourceStatus
29INR0148 Big Field Solar 345 506.2 Solar SS Completed, FIS Started, No IA
23INR0140 Seine BESS 345 308.9 Battery SS Completed, FIS Completed, IA
29INR0326 Montgomery Ranch 2 Wind n/r 301.5 Wind SS Completed, FIS Started, No IA
28INR0476 Pease River Solar 345 276.4 Solar SS Completed, FIS Started, No IA
28INR0535 Daisy Solar 345 200.9 Solar SS Started, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.