Daisy Solar
ERCOT queue ID 28INR0535
Daisy Solar (28INR0535) is listed in the ERCOT interconnection queue as a 200.9 MW solar project in Foard County, TX. The filing names Tap RILEY7A - EDITHCLA7B as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2029. It records the screening study as complete on October 1, 2026.
| Queue ID | 28INR0535 |
|---|---|
| Project name | Daisy Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap RILEY7A - EDITHCLA7B |
| Point of interconnection | Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B |
| County | Foard |
| State | TX |
| Voltage | 345 kV |
| Capacity | 200.9 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-06-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap RILEY7A - EDITHCLA7B substation: 6 requests in the ERCOT queue, 6 active totaling 3,256.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 32INR0006 | H&C WILBARGER POWER I | 1,025.6 | Gas | SS Started, FIS Started, No IA |
| 32INR0008 | H&C WILBARGER POWER II | 1,025.6 | Gas | SS Started, FIS Started, No IA |
| 29INR0148 | Big Field Solar | 506.2 | Solar | SS Completed, FIS Started, No IA |
| 28INR0476 | Pease River Solar | 276.4 | Solar | SS Completed, FIS Started, No IA |
| 28INR0464 | Grayback Solar | 221.8 | Solar | SS Completed, FIS Started, No IA |
Foard, TX: 5 requests in the ERCOT queue, 5 active totaling 1,593.9 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Daisy Solar LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2026-10-01 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.