Longfellow BESS II
ERCOT queue ID 24INR0455
Longfellow BESS II (24INR0455) is listed in the ERCOT interconnection queue as a 105.8 MW battery project in Pecos County, TX. The filing names TNCENTRY2_1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of March 30, 2028. It records the screening study as complete on February 3, 2023, the full interconnection study as approved on December 17, 2025 and the interconnection agreement as signed on April 15, 2025.
| Queue ID | 24INR0455 |
|---|---|
| Project name | Longfellow BESS II |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | TNCENTRY2_1 |
| Point of interconnection | 38432 TNCENTRY2_1 138 KV |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 105.8 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-03-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
TNCENTRY2_1 substation: 2 requests in the ERCOT queue, 2 active totaling 303.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 24INR0454 | Longfellow Solar II | 197.8 | Solar | SS Completed, FIS Started, IA |
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | CENTURY GAS PROCESSING, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-04-15 |
| Screening study complete | 2023-02-03 |
| Full interconnection study approved | 2025-12-17 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.