Longfellow Solar II

ERCOT queue ID 24INR0454

Longfellow Solar II (24INR0454) is listed in the ERCOT interconnection queue as a 197.8 MW solar project in Pecos County, TX. The filing names TNCENTRY2_1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on February 3, 2023 and the interconnection agreement as signed on April 15, 2025.

Queue ID24INR0454
Project nameLongfellow Solar II
Status (as published)SS Completed, FIS Started, IA
SubstationTNCENTRY2_1
Point of interconnection38432 TNCENTRY2_1 138 KV
CountyPecos
StateTX
Voltage138 kV
Capacity197.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

TNCENTRY2_1 substation: 2 requests in the ERCOT queue, 2 active totaling 303.6 MW.

Queue IDProjectMWResourceStatus
24INR0455Longfellow BESS II105.8BatterySS Completed, FIS Completed, IA

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Capacity revised −9.6 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting entityCENTURY GAS PROCESSING, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-04-15
Screening study complete2023-02-03
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first