Grimes, TX interconnection queue

18 active projects totalling 5,140.1 MW in the ERCOT queue.

18active projects
5,140.1active MW
18total filed
Queue IDProjectkVMWResourceStatus
26INR0370 Central Power Station 345 750 Gas SS Completed, FIS Started, No IA
29INR0333 Tyler Rose Power Plant 1 345 597.4 Gas SS Started, FIS Started, No IA
27INR0115 Diamante BESS 345 513.7 Battery SS Completed, FIS Completed, No IA
27INR0190 Millsing BESS 345 501.6 Battery SS Completed, FIS Completed, No IA
24INR0172 Smith Lake Solar DC 345 402 Solar SS Completed, FIS Started, IA
29INR0336 Tyler Rose Power Plant 2 345 398.2 Gas SS Started, FIS Started, No IA
28INR0394 Treehouse Solar 345 281.8 Solar SS Completed, FIS Started, No IA
26INR0285 Hill Valley BESS 345 245.8 Battery SS Completed, FIS Completed, IA
26INR0324 Misty Hollow BESS 345 245.8 Battery SS Completed, FIS Completed, IA
28INR0395 Treehouse Storage 345 209.2 Battery SS Completed, FIS Started, No IA
27INR0085 Eagle Claw Energy Center 345 204.6 Battery SS Completed, FIS Completed, IA
26INR0200 Vaughn Energy Storage 138 200.6 Battery SS Completed, FIS Completed, No IA
26INR0004 GRIMES SOLAR 345 153.5 Solar SS Completed, FIS Started, No IA
19INR0085 Blue Jay Solar 138 141.1 Solar SS Completed, FIS Completed, IA
27INR0379 Scrap Iron Solar 138 110.8 Solar SS Completed, FIS Started, No IA
21INR0538 Blue Jay Solar II 138 69 Solar SS Completed, FIS Completed, IA
25INR0045 Smith Lake Storage DC 345 65 Battery SS Completed, FIS Started, IA
26INR0001 Turin TxHSR TPSS HN-6 138 50 Other SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.