Smith Lake Solar DC
ERCOT queue ID 24INR0172
| Queue ID | 24INR0172 |
|---|---|
| Project name | Smith Lake Solar DC |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | TAP SINGLETON - ZENITH Ckt #99 |
| Point of interconnection | TAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99 |
| County | Grimes |
| State | TX |
| Voltage | 345 kV |
| Capacity | 402 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-12-29 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Smith Lake Solar |
|---|---|
| Cdr Zone | NORTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 46021 |
| Screening Study Complete | 44687 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.