Substation Scout

Goliad, TX interconnection queue

14 active projects totalling 2,666.5 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

14active projects
2,666.5active MW
15total filed
Queue IDProjectkVMWResourceStatus
26INR0664 Coleto Creek - Fuel Change Only 138 655 Gas SS Completed, FIS Started, No IA
27INR0149 Diablo Campo Storage n/r 313.5 Battery SS Completed, FIS Started, No IA
21INR0223 Tulsita Solar 138 256.2 Solar SS Completed, FIS Completed, IA
28INR0303 Kuy Creek Solar 1 SLF 138 234.9 Solar SS Completed, FIS Started, No IA
27INR0144 Angel City Solar n/r 221 Solar SS Completed, FIS Started, No IA
24INR0065 Keys Hollow Solar Phase II SLF 345 200.9 Solar SS Completed, FIS Started, IA
24INR0067 KEYS HOLLOW SOLAR SLF 345 200.9 Solar SS Completed, FIS Started, IA
28INR0304 Kuy Creek Storage 1 SLF 138 151.5 Battery SS Completed, FIS Started, No IA
23INR0206 PEREGRINE BESS 345 150 Battery SS Completed, FIS Started, No IA
25INR0078 Peregrine BESS 2 345 150 Battery SS Completed, FIS Started, No IA
27INR0248 Double A Solar SLF 69 132.6 Solar SS Completed, FIS Started, No IA
22INR0275 Coleto Creek ESS Addition n/r 100.1 Battery Inactive
24INR0066 Keys Hollow Storage Phase II SLF 345 0 Battery SS Completed, FIS Started, IA
24INR0068 KEYS HOLLOW STORAGE SLF 345 0 Battery SS Completed, FIS Started, IA
27INR0257 Double A Storage SLF 69 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.