Diablo Campo Storage
ERCOT queue ID 27INR0149
| Queue ID | 27INR0149 |
|---|---|
| Project name | Diablo Campo Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | The Coleto Greek (#) to Pawnee Switching Station (#) ; LCRA |
| Point of interconnection | The Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA |
| County | Goliad |
| State | TX |
| Voltage | Not reported |
| Capacity | 313.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Diablo Campo Energy Center, LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | OTH |
| Technology Code | BA |
| Screening Study Complete | 45411 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.